At CERN, we probe the fundamental structure of particles that make up everything around us. We do so using the world's largest and most complex scientific instruments.
Know more
Who we are
Our Mission
Our Governance
Our Member States
Our History
Our People
What we do
Fundamental research
Contribute to society
Environmentally responsible research
Bring nations together
Inspire and educate
Fast facts and FAQs
Key Achievements
Key achievements submenu
The Higgs Boson
The W boson
The Z boson
The Large Hadron Collider
The Birth of the web
Antimatter
News
Accelerators
At CERN
Computing
Engineering
Experiments
Knowledge sharing
Physics
Events
CERN Community
News and announcements
Official communications
Scientists
Press Room
Press Room submenu
Media News
Resources
Contact
The research programme at CERN covers topics from kaons to cosmic rays, and from the Standard Model to supersymmetry
Dark matter
The early universe
The Higgs boson
The Standard Model
+ More
CERN's accelerators
The Antiproton Decelerator
High-Luminosity LHC
Accelerating: radiofrequency cavities
Steering and focusing: magnets and superconductivity
Circulating: ultra-high vacuum
Cooling: cryogenic systems
Powering: energy at CERN
The CERN Data Centre
The Worldwide LHC Computing Grid
CERN openlab
Open source for open science
The birth of the web
ALICE
ATLAS
CMS
LHCb
By Topic
By format
360 image
Annual report
Brochure
Bulletin
Courier
Image
Video
By audience
CERN community
Educators
General public
Industry
Media
Students
Not only has the LHC reached its 2017 production target ahead of schedule, it has also doubled its design luminosity
Since it began operation in 2010, the LHC has delivered over 100 fb-1 (inverse femtobarns) of integrated luminosity to each of ATLAS and CMS
Recent CERN Control Centre (CCC) meetings have been dominated by "16L2"
On 28 June for the first time in history, the LHC collided beams with 2556 bunches per ring
After declaring stable beams, now it’s the period of scrubbing and intensity ramp-up, until 2556 bunches per beam will circulate in the machine
On Saturday, 29 April, two days ahead of schedule, beams were circulating again in the LHC
Almost ready: the LHC and its injectors are starting up one after the other
The re-filling of the arcs with liquid helium started last week, and the LHC is gradually being prepared for electrical tests at the end of the month
As part of the EYETS activities, the Linac3 ion source was converted to a xenon ion source