At CERN, we probe the fundamental structure of particles that make up everything around us. We do so using the world's largest and most complex scientific instruments.
Know more
Who we are
Our Mission
Our Governance
Our Member States
Our History
Our People
What we do
Fundamental research
Contribute to society
Environmentally responsible research
Bring nations together
Inspire and educate
Fast facts and FAQs
Key Achievements
Key achievements submenu
The Higgs Boson
The W boson
The Z boson
The Large Hadron Collider
The Birth of the web
Antimatter
News
Accelerators
At CERN
Computing
Engineering
Experiments
Knowledge sharing
Physics
Events
CERN Community
News and announcements
Official communications
Scientists
Press Room
Press Room submenu
Media News
Resources
Contact
The research programme at CERN covers topics from kaons to cosmic rays, and from the Standard Model to supersymmetry
Dark matter
The early universe
The Higgs boson
The Standard Model
+ More
CERN's accelerators
The Antiproton Decelerator
High-Luminosity LHC
Accelerating: radiofrequency cavities
Steering and focusing: magnets and superconductivity
Circulating: ultra-high vacuum
Cooling: cryogenic systems
Powering: energy at CERN
The CERN Data Centre
The Worldwide LHC Computing Grid
CERN openlab
Open source for open science
The birth of the web
ALICE
ATLAS
CMS
LHCb
By Topic
By format
360 image
Annual report
Brochure
Bulletin
Courier
Image
Video
By audience
CERN community
Educators
General public
Industry
Media
Students
The CERN accelerator complex is being switched off step-by-step in order to prepare for Long Shutdown 2 (LS2)
The final days of the LHC proton physics Run II are here
On 24 October, the LHC Operations team flipped the switch in the LHC island of the CCC to dump the last proton production fill of Run 2
Since the recovery from the recent machine development period, the LHC has been in luminosity production mode, crawling its way up towards 60 fb-1
At 2.02 p.m. on Saturday, 7 July, the last fill of the special physics run was dumped, ready for standard physics to resume
As I write this report, the integrated luminosity counter for ATLAS and CMS is at 23.1 fb-1, exceeding our goal of around 18 fb-1
The LHC is in full production mode with 2556 bunches per beam and has already successfully provided 14.6 fb-1 to each of ATLAS and CMS
On 5 May, the last step in the intensity ramp-up process was completed, ten days ahead of schedule. The LHC is now filled with 2556 bunches per beam
On 28 April 2018, 13 days ahead of schedule, the operators of the LHC successfully injected 1200 bunches of protons into the machine and collided them
The 2018 proton season has started well ahead of schedule
Despite the tight schedules, all machines were closed in time and first beams will be injected as scheduled
Now that the successful 2017 run has ended, let’s take a look back at a year full of events