Linac 4

Linear accelerator 4 (Linear 4) is designed to boost negative hydrogen ions to high energies. It is scheduled to become the source of proton beams for the Large Hadron Collider (LHC) after the long shutdown in 2017-18. 

34 results

Here’s to a long life for Linac 4!

Ten years after it was approved, CERN’s new accelerator is officially inaugurated

News
Accelerators
23 May, 2017
Accelerators
News
23 May, 2017

A brand new linear accelerator for CERN

At a ceremony today, CERN inaugurated its linear accelerator, Linac 4, the newest accelerator acquisition since the Large Hadron Collider (LHC)

News
Accelerators
09 May, 2017
Accelerators
News
09 May, 2017

Linac 4 reached its energy goal

After having accelerated a beam up to the design energy of 160 MeV, Linac 4 is now entering a new phase of its commissioning

News
Accelerators
14 November, 2016
Accelerators
News
14 November, 2016

Great progress across the board

The LHC’s success is not alone. Linac 4 and ELENA have also reached important milestones

Opinion
Accelerators
14 November, 2016
Accelerators
Opinion
14 November, 2016

Linac4 crosses the 100 MeV threshold

The new linear accelerator, which from 2020 will be the first link in the accelerator chain, has entered a new stage of its commissioning

News
Accelerators
08 July, 2016
Accelerators
News
08 July, 2016

Release the beams! Linac 4 hits the 50 MeV mark

Linac 4 now reaching milestone energy of 50MeV to act as replacement for ageing Linac2, before taking over at head of accelerator chain in 2020

News
Accelerators
26 November, 2015
Accelerators
News
26 November, 2015

Linac4 Drift Tube Linac under assembly

After years of design, prototyping and manufacturing, the Linac4 Drift Tube Linac is being assembled at CERN

News
Accelerators
13 May, 2014
Accelerators
News
13 May, 2014

The very model of a modern pi-mode structure

The first new PI-Mode Structure (PIMS) cavity for Linac 4 is under assembly at CERN

News
Engineering
03 March, 2014
Engineering
News
03 March, 2014

First H- beam at Linac 4: 3 MeV done, 157 MeV to go

On 14 November, the first H- beam was accelerated to the energy of 3 MeV in Linac 4

News
Accelerators
25 November, 2013
Accelerators
News
25 November, 2013

Linac 4 accelerates its first beam

This month a beam of negative hydrogen ions was injected into the first accelerator module of Linac 4

News
Accelerators
25 March, 2013
Accelerators
News
25 March, 2013