SCE department has been informed that a works permission with traffic disruption on Meyrin road has just been granted by the French authorities.
From Tuesday 2 April at 9 a.m. to Wednesday 3 April 2024 4 p.m., works on green spaces will take place along the Schrödinger road (inside CERN site) and Meyrin Road (French side).
These works together with a crane installation and operation in the area will cause traffic disruption on adjacent roads, and temporary detour roads.
The Jentschke road will be closed for two days from Tuesday 2 to Wednesday 3 April.
The Schrödinger road will be closed on Tuesday 2 April at 9:00 am until 4:00 pm.
The Meyrin road will remain open to traffic, with temporary two-minute closures every 15 minutes, on Tuesday 2 April from 9:00 am to 4:00 pm.
It is therefore strongly recommended to avoid using these roads and prefer bypasses as far as possible for the whole duration of the works.
Thank you for your understanding.