Voir en

français

Prévessin: Chemin du Moulin des Ponts open to vehicles

The SMB department has decided to allow vehicle access to the Prévessin site via the Chemin du Moulin des Ponts entrance from 4 June to 13 July 2018

|

Due to the work taking place at the Prévessin crossroads and the resulting traffic disruption, the SMB department has decided to allow vehicle access to the Prévessin site via the Chemin du Moulin des Ponts entrance (transit area) from 4 June to 13 July 2018 on weekdays at the following times:

  • 7 a.m. to 9 a.m.
  • 11.30 a.m. to 1.30 p.m.
  • 4.30 p.m. to 6.30 p.m.

Pedestrians and cyclists must continue to use the turnstile at this entrance.