4-11 February: work on main building flooring

There will be some disruption during repairs to the flooring in front of the kiosk

|

Repairs will be made to the shiny part of the flooring on the ground floor of the main building near the kiosk next week. Work will take place between 3pm Monday 4 February until approximately 8am Monday 11 February. During this time:

  1. Protection of the work area. In order to safely carry out the work, the area in front of the kiosk will be  inaccessible. People wanting to get in to restaurant 1 should follow the directions that will be put in place.
  2. Toilets out of service. The toilets that are normally accessible next to the kiosk will be out of service. Alternative facilities are available on the first floor of the main building.
  3. Access ramp. A temporary ramp will be put in place near the elevators.
  4. Temporary kiosk. A temporary kiosk will be set up opposite the take-away food bar between 8am and 4pm.