At CERN, we probe the fundamental structure of particles that make up everything around us. We do so using the world's largest and most complex scientific instruments.
Know more
Who we are
Our Mission
Our Governance
Our Member States
Our History
Our People
What we do
Fundamental research
Contribute to society
Environmentally responsible research
Bring nations together
Inspire and educate
Fast facts and FAQs
Key Achievements
Key achievements submenu
The Higgs Boson
The W boson
The Z boson
The Large Hadron Collider
The Birth of the web
Antimatter
News
Accelerators
At CERN
Computing
Engineering
Experiments
Knowledge sharing
Physics
Events
CERN Community
News and announcements
Official communications
Scientists
Press Room
Press Room submenu
Media News
Resources
Contact
The research programme at CERN covers topics from kaons to cosmic rays, and from the Standard Model to supersymmetry
Dark matter
The early universe
The Higgs boson
The Standard Model
+ More
CERN's accelerators
The Antiproton Decelerator
High-Luminosity LHC
Accelerating: radiofrequency cavities
Steering and focusing: magnets and superconductivity
Circulating: ultra-high vacuum
Cooling: cryogenic systems
Powering: energy at CERN
The CERN Data Centre
The Worldwide LHC Computing Grid
CERN openlab
Open source for open science
The birth of the web
ALICE
ATLAS
CMS
LHCb
By Topic
By format
360 image
Annual report
Brochure
Bulletin
Courier
Image
Video
By audience
CERN community
Educators
General public
Industry
Media
Students
Half of Route Rutherford, between building 361 and building 271, will be closed to traffic from Friday 10 February 7 a.m. to Friday 7 April 5.30 p.m.
From 5 to 9 December, the section of Route Démocrite between Buildings 179 and 158 will be closed to traffic
Work will be carried out at Gate B (route Pauli) on the Meyrin site from 21 November to 7 December
The registration plate readers on Routes Scherrer and Bohr are now operational and have already started to collect data
The flagpole car park will be inaccessible from the morning of 1 September 2016 until around 1 p.m. on 5 September 2016
CERN owns a fleet of more than 500 bikes and cars, which are available for personnel use
Diversions will be in place on Route Scherrer and Route Bohr from 4 to 31 July.
BLOCH road will be closed between Building 24 to the intersection with the route SALAM, starting from 1 February for at least 13 months